Mandatory smart meters: who is affected

Technically reviewed by Reinlicht Elektrotechnik, as of 31 October 2026

The short answer

An intelligent metering system (smart meter) is mandatory if you consume more than 6,000 kWh of electricity a year, operate a controllable consumer device under § 14a EnWG such as a heat pump or wallbox, or have a generating installation above 7 kW. All other households receive at least a digital meter by the end of 2032, and a smart meter only on request or at the metering point operator's discretion.

What exactly is a smart meter?

In German law a smart meter is called an intelligent metering system (intelligentes Messsystem): a digital meter plus a smart meter gateway. The Messstellenbetriebsgesetz (MsbG, the German Metering Point Operation Act) distinguishes it from the modern metering device (moderne Messeinrichtung). The modern metering device is a digital meter without a communication module. It shows consumption and its history on the device but does not transmit any data.

The smart meter gateway transmits the readings securely to grid operators and suppliers. Only then are functions possible that need remote readings, such as a dynamic electricity tariff whose price follows the power exchange price. In everyday language, “smart meter” usually means the intelligent metering system, and “digital meter” often means the modern metering device.

When is a smart meter mandatory?

Under § 29 MsbG, a smart meter is mandatory in three cases. The default metering point operator (grundzuständiger Messstellenbetreiber) must then install it, provided this is economically justifiable under the statutory price caps. What counts is your consumption, controllable devices and the capacity of your own generating installation.

  • Annual consumption above 6,000 kWh, measured as the average of the last three years.
  • A controllable consumer device with an agreement under § 14a EnWG (Energiewirtschaftsgesetz, the German Energy Industry Act), such as a heat pump or wallbox.
  • A generating installation, such as photovoltaics, with more than 7 kW of installed capacity.

For controllable consumer devices and larger generating installations, a control unit is added as well. Through it, the grid operator can limit the power when necessary.

Outside these cases, the metering point operator may install an intelligent metering system but is not obliged to. It must equip every metering point with at least a modern metering device by the end of 2032. There is no statutory way to refuse the installation.

How much may a smart meter cost?

With the default metering point operator, a smart meter may cost no more than the price caps in § 30 and § 32 MsbG allow. The caps apply per year and include VAT. For an intelligent metering system, the amount is split between you as the connection user and the grid operator.

Price caps per year, gross (§ 30 and § 32 MsbG)
CaseTotal capOf which connection user
Modern metering device€25€25
Intelligent metering system, voluntary or optional€60€30
Consumption above 6,000 to 10,000 kWh€120€40
Consumption above 10,000 to 20,000 kWh, § 14a EnWG, or generating installation above 7 to 15 kW€130€50
Consumption above 20,000 to 50,000 kWh, or generating installation above 15 to 25 kW€190€110

Up to €50 a year may be charged in addition for a control unit at the grid connection. Competitive metering point operators are not bound by these caps.

If you request early installation, you get it within four months. The law regards a one-off amount of up to €100 as reasonable for this. According to the Verbraucherzentrale (consumer advice centre), this is not a fixed cap. Ask the metering point operator for the amount beforehand.

When will the smart meter be installed?

In the mandatory cases, smart meters are being installed step by step until the end of 2032. Mandatory installation for consumers has been under way since 2025. By the end of 2025 at least 20 per cent of mandatory cases were to be equipped, and by the end of 2032 at least 90 per cent (§ 45 MsbG). By then, all other metering points are also to have at least a modern metering device.

The metering point operator announces the installation of an intelligent metering system at least three months in advance. Two weeks before the appointment, a written notice follows with at least one alternative date. So you do not have to initiate the installation yourself.

Note: As of 31 October 2026: on 2 July 2026 the coalition committee agreed on a lower-cost “Smart-Meter-Light” for households outside the mandatory cases. This requires an amendment to the MsbG; no such law exists yet. The Verbraucherzentrale Bundesverband (Federation of German Consumer Organisations) has published a position paper with its demands. The mandatory cases and price caps on this page reflect the law currently in force.

Who is responsible in the Munich area?

Smart meter installation is the responsibility of the default metering point operator, which is in charge of the meters in the respective grid area. In the grid area of Stadtwerke München this is SWM Infrastruktur GmbH & Co. KG. It names its area as Munich, Moosburg, Garching, Aschheim, Kirchheim, Feldkirchen and Ottobrunn.

Outside this area, the local grid operator or its metering point operator is responsible. You can instead commission a competitive metering point operator. According to SWM Infrastruktur, once it has installed a meter, two years must pass before another operator can take over the metering point.

Note: SWM Infrastruktur warns of misleading letters from third-party providers about smart meter installation. You do not have to respond to advertising letters. Check who is writing to you before you sign anything.

Does my meter cabinet need to be modified?

A meter cabinet must be modified if the meter position cannot accommodate the meter and the smart meter gateway, for example in older installations. The metering point operator supplies and replaces the meter itself. The connection owner (Anschlussnehmer), meaning the owner of the house or apartment, is responsible for a suitable meter position.

The costs of modifying the meter cabinet are therefore borne by the owner, not by the metering point operator. The Verbraucherzentrale cites one-off additional costs of up to several thousand euros. If you are planning a heat pump, wallbox or photovoltaic system anyway, it is best to have the meter cabinet checked as part of that work.

Note: Under § 13 NAV (Niederspannungsanschlussverordnung, the German Low Voltage Connection Ordinance), work between the service fuse and the meter may only be carried out by the grid operator or by a contractor listed in a grid operator's register of approved installers. This also applies to modifying the meter cabinet.

How does an electrical contractor prepare the installation?

An electrical contractor prepares the meter position; the metering point operator replaces the meter itself. This usually becomes important when a heat pump, a wallbox or a photovoltaic system is added, creating a mandatory case with a control unit. The electrical contractor registers controllable consumer devices with the grid operator as part of this.

Reinlicht Elektrotechnik is an electrical contractor based in Taufkirchen and is listed in the registers of approved installers of the grid operators in our service area. On site we check whether the meter cabinet has space for the meter, gateway and control unit, what condition the meter position and main supply cable are in, and whether the cabinet meets the grid operator's requirements. For the appointment, these documents help:

  • The notification letter from the metering point operator, if you have received one.
  • The meter number and your latest annual bill showing your consumption.
  • Planned devices such as a heat pump, wallbox or photovoltaic system, with their power ratings.
  • Photos of the meter cabinet with the cover closed, if you would like an initial assessment in advance.

Frequently asked questions

The most common questions, answered briefly. If yours is not among them, call us or send an enquiry.

Can I refuse the installation of a smart meter?

No. The MsbG provides no right to object, either in mandatory cases or for optional installation by the metering point operator.

Do I need a smart meter for a dynamic electricity tariff?

Yes. Dynamic tariffs require an intelligent metering system; a digital meter without a gateway is not enough. You can request early installation from the metering point operator.

Who pays for the new meter?

In the standard case, the meter, installation and operation are covered by the annual metering charge, which is capped by law. Any necessary modification of the meter cabinet is paid for by the owner.

Does the obligation also apply to my balcony solar system?

No. The obligation for generating installations starts above 7 kW. For a balcony solar system, an unsuitable old meter is simply replaced with a bidirectional meter.

Can I choose my metering point operator myself?

Yes. Instead of the default operator, you can commission a competitive metering point operator. Its prices are not bound by the statutory caps, so compare before you decide.

Sources

Laws, standards and figures change. We checked the information as of the date given; the linked original sources are authoritative. This article does not replace advice on your specific case.

  1. Bundesministerium der Justiz: § 29 Messstellenbetriebsgesetz (opens in a new tab) accessed on 30 October 2026
  2. Bundesministerium der Justiz: § 30 Messstellenbetriebsgesetz (opens in a new tab) accessed on 30 October 2026
  3. Bundesministerium der Justiz: § 32 Messstellenbetriebsgesetz (opens in a new tab) accessed on 30 October 2026
  4. Bundesministerium der Justiz: § 45 Messstellenbetriebsgesetz (opens in a new tab) accessed on 30 October 2026
  5. Verbraucherzentrale: Smart Meter, was Sie über die Stromzähler wissen müssen (Stand 10.08.2026) (opens in a new tab) accessed on 30 October 2026
  6. Verbraucherzentrale Bundesverband (Position): Positionspapier Smart-Meter-Light (20.08.2026) (opens in a new tab) accessed on 31 October 2026
  7. Verbraucherzentrale: Dynamische Stromtarife (opens in a new tab) accessed on 30 October 2026
  8. SWM Infrastruktur: Fragen und Antworten zum Messstellenbetrieb (opens in a new tab) accessed on 30 October 2026
  9. Stadtwerke München: Smart Meter, intelligente Messsysteme (opens in a new tab) accessed on 30 October 2026
  10. SWM Infrastruktur: Hinweis zu irreführenden Schreiben (opens in a new tab) accessed on 30 October 2026
  11. Bundesministerium der Justiz: § 13 Niederspannungsanschlussverordnung (opens in a new tab) accessed on 30 October 2026

Questions about your installation?

Call us or send an enquiry. We will assess the situation on site and tell you what is needed.