Older houses, new loads
The Dachau district has 36,209 residential buildings, according to Statistik kommunal 2025. Anyone buying or modernising an older house often plans a wallbox, heat pump or photovoltaics at the same time.
That is when it becomes clear whether the meter cabinet can keep up. During the site visit we look at these points:
- Space for meters, fuses and new circuits.
- Residual current devices (RCDs) and how they are assigned to the circuits.
- Condition of cables and connections.
- What the grid operator requires for the new system.
You then receive a written quote. Whether a conversion is needed depends on the findings on site, not on the year of construction alone.
Grid operators in the Dachau district
For a grid connection, wallbox or photovoltaics, what counts is the grid operator at the installation's location. In the Dachau district, VNBdigital lists these operators:
| Municipality | Electricity grid operator |
|---|---|
| Dachau | Stadtwerke Dachau |
| Haimhausen | E-Werke Haniel Haimhausen or Bayernwerk Netz, depending on street and locality |
| Remaining 15 municipalities | Bayernwerk Netz GmbH |
Note: Concessions and grid companies change. We clarify which operator is responsible for your address before submitting the application. As of November 2026, according to VNBdigital.
Inspections for landlords and property managers
For rented flats and apartment buildings, we inspect the electrical installation and document the result in a test report. This helps when tenants change and before a modernisation.
Our guide explains what an E-Check (electrical safety inspection) covers and when it makes sense. We arrange appointments Monday to Saturday, 8 am to 4 pm. The 24/7 emergency service runs via the mobile number, is an additional service and is charged separately. We do not give fixed arrival times.