Six municipalities in the south of the district
This page covers the municipalities south and south-west of Munich, from Pullach to Schäftlarn. Around 40,000 people live here in total.
| Municipality | Population (31 Dec 2024) | Driving distance from Taufkirchen |
|---|---|---|
| Grünwald | 11,179 | approx. 11 km |
| Sauerlach | 8,063 | approx. 11 km |
| Straßlach-Dingharting | 3,258 | approx. 13 km |
| Pullach | 8,601 | approx. 14 km |
| Baierbrunn | 3,376 | approx. 14 km |
| Schäftlarn | 5,840 | approx. 20 km |
Population figures from the Landratsamt München, based on data from the Bayerisches Landesamt für Statistik (Bavarian State Office for Statistics). Driving distances calculated with OpenStreetMap data to the town centre, for guidance only.
Who operates the electricity grid here
There is no single grid operator in the south of the district. Pullach and Grünwald have transferred their electricity grids to companies in which the municipality holds a majority stake. For every registration, what counts is the grid operator responsible for the address of the installation.
| Municipality | Electricity grid operator | Source |
|---|---|---|
| Pullach | Stromnetz Pullach GmbH, 51 per cent held by the municipal IEP, 49 per cent by Bayernwerk Netz | ZfK, report of 29 Nov 2018 |
| Grünwald | Grid of Elektrizitätsnetzgesellschaft Grünwald mbH & Co. KG, technically operated by Bayernwerk as leaseholder | Bayernwerk, press release of 21 Dec 2015 |
| Baierbrunn | Bayernwerk Netz GmbH | Bayernwerk, press release of 6 May 2025 |
| Sauerlach | check with the local grid operator | no verified source |
| Schäftlarn | check with the local grid operator | no verified source |
| Straßlach-Dingharting | check with the local grid operator | no verified source |
Note: Grid companies and concessions change. Before a registration we check the current grid operator for your address. As of October 2026.
Register before the system goes live
Whether it is a wallbox, photovoltaics or a large new load: the grid operator wants to know in advance. Under § 19 NAV, charging points must be notified before commissioning. Above 12 kVA total capacity, the operator's consent is also required.
Since 1 January 2024, grid operators must also allow such notifications via their website (§ 19(4) NAV). Forms and portals still differ from operator to operator, especially with small grid companies.
Note: Apart from the grid operator, only an installation company listed in a grid operator's register of approved installers may install, extend or modify the electrical installation behind the service connection (§ 13 NAV).
For a quote we first inspect the installation on site, then you receive a written quote. The 24/7 emergency service runs through the mobile number, as an additional service charged separately.